Nyingchi Science advances hydropower energy development and comprehensively strengthens power grid construction

By 2015, during the “Twelfth Five-year Plan” period in which the total installed capacity is expected to reach more than 400,000 kilowatts, the Nyingchi region will closely follow the goal of building a national “West-to-East Power Transmission” to continue the energy base, and give full play to the larger water reserves. With its advantages, it adheres to the principle of “protecting in development and developing in protection”, accelerates the pace of development and utilization of hydropower energy, and promotes the transformation of rich hydropower energy advantages into economic advantages.

Scientifically compile hydropower energy planning. Based on the current situation, we must focus on the long-term, adapting measures to local conditions, and rationally allocate and scientifically formulate regional hydropower development and utilization plans, and correctly handle the relationship between hydropower development, comprehensive utilization of water resources, ecological and environmental protection, and regional economic development.

Step by step to promote power construction. Speed ​​up the development of the use of hydropower resources in rivers and rivers such as Nu River, Parom Tibet River, Brahmaputra River, and Niyang River. We will strengthen the contact with power companies such as Guodian, Datang, and Huaneng, and start the construction of multiple power plants such as Dubbing and Wavestack. Do a good job in surveying, designing, demonstrating, reporting and constructing power stations such as Songta, Hudong, Russell, Zara Ferry and Nissi. By 2015, the total installed capacity of the entire country is expected to reach more than 400,000 kilowatts, and the output of hydropower and energy will increase substantially. The hydropower energy industry has become an important source of growth that supports the accelerated development of the regional economy.

Comprehensively strengthen the power grid construction. Based on the networking between Nyingchi Power Grid and Zangzhong Power Grid, the ability to export and access grid power in the collection is enhanced, and the Nyingchi Power Grid aims to deliver more power to the Lhasa load center. Construction of Nyingchi 220KV step-up transformer substation with a capacity of 300,000 KVA, and the construction of a new tiger mouth - Linzhi - Qugei's second round of 220KV lines, will be done in Lanxian and Chayu counties. Accelerate the pace of technological transformation of urban power grids, increase the power supply capacity and power supply quality of urban power grids, and meet the economic development and social power demand of “three counties and one town” in Nyingchi County, Gongbujiangda County, Milin County, and Bayi Township.

Significant product benefits:
1)A full line of spools in a variety of standard sizes
2)High speed custom labeling and printing on flanges available – even on short runs
3)One piece molded construction for strength and precision
4)Appealing designs as well as ergonomics (no sharp edges)
Type Weight
(gram)
d1
(mm)
D1
(mm)
d2
(mm)
D2
(mm)
H1
(mm)
H2
(mm)
d3
(mm)
A1
(mm)
A2
(mm)
d4
(mm)
E
(mm)
PC-70 40 70 38 70 85 20 7 7

PC-80 70 80 50 64 80 20 8 8 7 20
PC-83 70 83 45 100 120 20 10 10

PC-100A 110 100 45 70 88 20 9 9

PC-100B 100 100 45 100 120 20 10 10

PC-125A 180 125 65 100 120 20 10 10 7 20
PC-125B 170 125 70 100 120 20 10 10

PC-130A 200 130 65 100 120 22/25 10 10

PC-130B 210 130 65 100 120 22 10 10

SH-16 230 150 90 100 124 30 12 12 12 26
PC-185A 400 185 128 155 178 30 11 11

PC-185B 500 185 128 155 178 30 11 11

PC-185C 500 185 130 160 180 30 10 10

PC-220A 660 220 110 155 185 40 15 15 12 42
PC-220B 660 220 110 155 185 38 15 15 15 38
PC-220C 660 220 110 155 185 30 15 15 14 38
PC-250 870 250 110 155 185 40 15 15 12 42
PC-300A 1400 300 180 170 200 32 15 15 17 45
PC-300B 1400 300 180 170 200 100 15 15 20 125
PC-355 1950 355 224 160 200 36 20 20 26 50~80
PC-410 4550 410 310 180 228 70 24 24

PC-500A 8450 500 315 180 250 40 35 35 26 70~100
PC-500A1 8450 497 315 180 250 40 35 35 26 70~100
PC-500B 8600 500 250 250 300 56 25 25 26 70~100
PC-500B2 9020 500 250 240 290 40 25 25 26 70~100
PC-500C 8600 500 250 235 300 56 20 20 26 70~100



 

Wire Packaging Spool

Wire Packaging Spool, Magnet Wire Reel, Magnet Wire Spool, Packing Wire Spool

NINGBO BEILUN TIAOYUE MACHINE CO., LTD. , http://www.spool-manufacturer.com