Taizhou Fenghuang Henan Yan project greening tender notice

Taizhou Fenghuang Henan Yan project greening tender notice

Announcement time: 2016-9-27



Taizhou Fenghuang Henan Yan project greening tender notice

The project is divided into three sections: A, B, and C. The main contents of this project are as follows: Section A starts from the Zhoushan River and ends at the Jianggao Highway, the station number is K0+000~K2+557, the total length is 2557m, and the greening width is about 10 -12m, green area is about 60,000 m2. Section B starts at Suwano Bridge, ends at Innovation Avenue, and stands K4+169~K8+428. It has a total length of 4259m, greening width is about 9-12m, and greening area is about 95,000 m2. Section C starts at Taiping Bridge and ends at Xuzhuang River, with a total length of 1367m and K9+457~K10+824. The greening width is about 9-13m, and the greening area is about 33,000m2. About 20 million yuan investment.

The project is scheduled to start in October 2016 (the specific commencement date will be based on the issuance of the supervision engineer's starting date). The project schedule is 210 calendar days. The project will be paid on a monthly basis. It shall be paid on the 20th of every month according to 50% of the actual completion amount of the supervision engineer's visa. It shall pass 10% of the actual completion amount after passing the completion acceptance and completing the completion audit. The remaining 40% will be paid within the period of two years of protection. The first three semi-annual periods will be paid at 5% for each semi-annual period, and the fourth half of the period will be at 15% for nuclear expenditure. After the period of management and maintenance expires, the remaining 10 will be paid. %.

When the contractor pays for the project payment, the contractor shall follow the six departments of Taizhou City Human Resources and Social Security Bureau (Tairenshefa [2016] No. 35), and forward the six departments such as the Department of Human Resources and Social Security of Jiangsu Province on the overall control of arrears. The Opinions on Implementing Employees' Wage Problems stipulated in the document required to provide monthly written records of peasant workers' labor attendance and wages payment, as well as migrant workers' wage payment lists. If no valid data is provided, the contractor will temporarily suspend the payment of the project funds until the contractor is required to After the rectification is completed, the project payment will be paid.

Second, bidder qualification requirements

1. It is required to have a qualification of landscaping.

2. The project manager to be appointed by the bidder shall have the qualification to register as an engineer or a municipal or grade one constructor and must have no main project under construction.

3. Upon inquiry by the local People's Procuratorate inquiring for bribery crime files, from September 26, 2015 to the date of the announcement, the bidding company, legal representative of the enterprise, and project manager had no record of crimes of bribery.

4, after the qualification for this tender. Bid documents that fail to pass the examination after qualification will be treated as scrapped.

Third, the tender documents

1. This project implements electronic tendering and bidding. Please invite interested parties to participate in bidders on October 1, 2016 at 17:00.
Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.